Quality Assurance  

   


Quality Assurance is the No. 2 driver on projects, following No. 1 Health & Safety


Genco Superintendent undertaking HV Cable Surveillance
Engine FAT testing prior to shipping
   

Genco Project Drivers: 

#1 Health & Safety
#2 Quality
#3 Schedule 
#4 Cost

Genco implements a rigorous Quality Assurance Management Program on every project. Genco QA programmes meet any international standard.  

Quality Assurance management covers;



  • Site compliance
  • Heritage compliance
  • Local Authority compliance
  • Environmental compliance
  • Health & Safety compliance
  • Contractor management  
  • Earthworks
  • Civil Works & underground services
  • Buildings & fencing 
  • HV reticulation
  • Gas reticulation 
  • HV transformers & switchgear
  • Generation plant
  • Balance of plant

Project Library of QA Handover pages

Quality Assurance documentation;


  • AFC drawings
  • Materials approvals
  • As-con drawings
  • Building permits
  • Traffic management
  • Site survey, setout & pickup
  • Assembly & installation techniques
  • Buildings and construction
  • Concrete testing
  • Geo-tech' testing
  • Compaction testing
  • Hydraulic testing
  • Cable testing
  • Valve, pressure testing
  • Factory acceptance testing (FAT)
  • Non destructive testing (NDT)
  • Thermoconductivity testing
  • Thermoresistivity testing
  • Cable Jointing & Terminations
  • MDR's, ITP's, NCR's, RFI's
  • Hold & witness inspections
  • Environmental compliance & clearing permits
  • Gas compliance
  • Electrical compliance
  • Mechanical compliance
  • Fire compliance
  • Cranage, lifting & placement
  • Stock control
  • Shipping and cartage
  • Commissioning
  • Punch lists and close out
  • PC certification & handover

Buried HV Cable QA prior to backfill

Quality Assurance Audit

On every project we recommend that the Quality Assurance Management program to undergo at least two independent Audits. These audit results report directly to the client.