Project Facts at a Glance:
- 2.5km, 22kV underground and overhead Interconnection
- Connecting Solar Titan 250 Closed Cycle Gas Turbine Powerplant to the Grid
- Total Construction Management
- Managed up to 60x site crew and contractors
- Project cost USD $5 Million
Of Significance:
- Construction completed in just 7 months
- Successful completion of these works were through the middle of a live, fully operating Petro Chemical refinery - very rigorous & intense daily Work permitting and Safety compliance.
- Route and connection via 2x live substations (22kV & 66kV)
- Genco scope included securing full HV Regulatory Compliance sign off
- Required the closing of a city main highway for 2 days whilst 24 hour crews installed cable ducts under road
- Required building 11kV surface cable ladder around live high pressure gas line network
- Required constructing civil works then installing HV Switching equipment within a live 66kV Switchyard
- Required hauling 22kV overhead cables over live high pressure gas line network